Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations waross on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Recent content by l0v7109

  1. l0v7109

    AWS D3.6M

    I have to write a WPS for underwater welding of shear studs. The format shown in AWS D3.6M asks for the following info: D.W.C Gas, D.W.C. Pressure, D.W.C. Temp. What does "D.W.C." stand for?
  2. l0v7109

    Drawing for PDA 27 Sheetpile

    I am trying to draw an ACAD drawing of the cross section view of a Bethlehem & US Steel PDA 27 sheetpile. But I don't have a copy with the dimensions of the interlocks. Is there any place where I can get either an ACAD drawing or a hardcopy drawing of these sheetpiles?
  3. l0v7109

    inspection procedure for a Groove Joint

    Thank you for the responses. But I am not sure if the backing bar would affect the results are not.
  4. l0v7109

    Inspection Procedure for a Single Bevel Groove Joint 2G

    We are welding a 1 1/4" thick pile on site with a SIngle Bevel Groove Joint with a backing Ring. The weld is in 2G position. There is no access to get in once the welding is done. We are trying to figure out the kind of Inspection testing to be done on the weld. Is there any specifications...
  5. l0v7109

    Inspection Procedure for Single Bevel Groove Joint 2G Pipe

    We are welding a 1 1/4" thick pile on site with a SIngle Bevel Groove Joint with a backing Ring. The weld is in 2G position. There is no access to get in once the welding is done. We are trying to figure out the kind of Inspection testing to be done on the weld. Is there any specifications...
  6. l0v7109

    inspection procedure for a Groove Joint

    We are welding a 1 1/4" thick pile on site with a SIngle Bevel Groove Joint with a backing Ring. The weld is in 2G position. There is no access to get in once the welding is done. We are trying to figure out the kind of Inspection testing to be done on the weld. Is there any specifications...
  7. l0v7109

    Pre-Qualified Welding Procedure Specification

    Where do I look for getting the information that would say that Pre-qualified WPS does not require a PQR?

Part and Inventory Search