    Stability of pre-tied bridge column steel

    The only thing that DOT would approve was to set the form in place and hold on to the form while a second line lowered the pre-tied cage into the form. At that point, the form is lifted a few feet to allow the cage to be tied to the dowels of the previous pour. This probably is more dangerous...
  2. KNOBHEAD2

    Stability of pre-tied bridge column steel

    We recently had an accident where the 2nd lift of pre-tied rebar on a 12ftx4.5ft bridge column collapsed when a guy cable broke (do not yet know what broke the cable). The pretied column simply bent over (staying tied to the first pour projecting steel) like a limp weiner and stayed completely...