Thanks for all.
cvg,
So, to increase the compaction from 95% spd to 98% spd usually just need one more pass by the roller right? I will ask them about that. I think I need ask some nother contrators for the cost as well.
muuddfun,
sorry for the misunderstanding?that 200mm is the thickness...
Hi Muuddfun,
Thank you for your reply.
I couldn’t find why they spec. 98% originally and yes, that is a standard proctor density. The crushed gravel and pit-run defines as below
Metric (mm) US Percent Passing
20.000 3/4" 100
16.000 5/8” 84-94...
Hi,
I hope someone can help me out of this. I have an industry site here. Originally? it was spec. as 100mm crushed gravel and 200mm pit-run with 98% SPD compaction. Then the contractor told me if I can reduce 98% SPD to 95% SPD, the compaction cost can drop 40%. So, any thought of that or any...
thanks jthompson and toones.
jthompson
I think liner is a typical standard in industry . for residential we do not need a liner. Correct me if I am wrong.
toones
We do not have a geotechnical engineer in our firm. But since that's not sounds good. I will certainly ask a geotechnical engineer's...
Thanks for reply, PELS
I am planning to do a ramp for sediment clean up(15% for the ramp). backhole or loader can use that ramp reach the bottom of the pond then do the digging. Is that OK?
Thanks, msucog
I am looking at some documents are said 3:1 is recommend for clay liner. I am not sure why 3:1. I do have experience do 2:1 slope excavation for clay(road, not pond). That works very well. What's your suggestion or experience?
Unfortunately, in our form, nobody has that...
thanks,msquared48
One thing that I didn't mention is, that's a coal mine site, the client did a lot excavation jobs. If he said 1:1 slope is OK, then he should did that before.
Hi, All
I’m designing a sedimentation pond now and three issues here.
The first one is that client want to built the pond in this winter. Then, he said we don’t need worry about the high ground water table. I am still worry about that. Since the pond is 12 feet deep, the frost depth is about...
Thanks Zambo,
It's a minor rail.
And of cause we can bring the material in, as you said I do need a drain at the base of the embankment, that cause the base of the embankment goes to deeper and deeper, at the end of road, the base will be 4m deeper than the road, can backhole reaches that 4m...
Thanks for all!
The issue is that concrete wall is for holding the tank farm and it’s about 2m height. The client wants to build a road right against the wall with the same height.
My thinking is to build the road, the construction contractor should use a dozer start with the rail side to...
Dear all,
We have a site is 15m wide (one side is rail way and the other side is concrete wall). I need design a 4m wide road get through that (length will be about 750m). Anybody knows construction contractor can do that or not? Thanks in advance.
jyf