Recent content by jyf

  1. jyf

    Aggregate Compaction?

    Thanks for all. cvg, So, to increase the compaction from 95% spd to 98% spd usually just need one more pass by the roller right? I will ask them about that. I think I need ask some nother contrators for the cost as well. muuddfun, sorry for the misunderstanding?that 200mm is the thickness...
  2. jyf

    Aggregate Compaction?

    Hi Muuddfun, Thank you for your reply. I couldn’t find why they spec. 98% originally and yes, that is a standard proctor density. The crushed gravel and pit-run defines as below Metric (mm) US Percent Passing 20.000 3/4" 100 16.000 5/8” 84-94...
  3. jyf

    Aggregate Compaction?

    Hi, I hope someone can help me out of this. I have an industry site here. Originally? it was spec. as 100mm crushed gravel and 200mm pit-run with 98% SPD compaction. Then the contractor told me if I can reduce 98% SPD to 95% SPD, the compaction cost can drop 40%. So, any thought of that or any...
  4. jyf

    sedimentation pond issues

    hooooops, toones, why is that? So, we cannot do it in winter?
  5. jyf

    sedimentation pond issues

    thanks jthompson and toones. jthompson I think liner is a typical standard in industry . for residential we do not need a liner. Correct me if I am wrong. toones We do not have a geotechnical engineer in our firm. But since that's not sounds good. I will certainly ask a geotechnical engineer's...
  6. jyf

    sedimentation pond issues

    Thanks PELS and cvg. Any body knows compact rate and lift for the clay liner? I want go 96%S.P.D. and every 6" lift, is that OK?
  7. jyf

    sedimentation pond issues

    Thanks for reply, PELS I am planning to do a ramp for sediment clean up(15% for the ramp). backhole or loader can use that ramp reach the bottom of the pond then do the digging. Is that OK?
  8. jyf

    sedimentation pond issues

    Thanks, msucog I am looking at some documents are said 3:1 is recommend for clay liner. I am not sure why 3:1. I do have experience do 2:1 slope excavation for clay(road, not pond). That works very well. What's your suggestion or experience? Unfortunately, in our form, nobody has that...
  9. jyf

    sedimentation pond issues

    thanks,msquared48 One thing that I didn't mention is, that's a coal mine site, the client did a lot excavation jobs. If he said 1:1 slope is OK, then he should did that before.
  10. jyf

    sedimentation pond issues

    I am in Alberta, Canada
  11. jyf

    sedimentation pond issues

    Hi, All I’m designing a sedimentation pond now and three issues here. The first one is that client want to built the pond in this winter. Then, he said we don’t need worry about the high ground water table. I am still worry about that. Since the pond is 12 feet deep, the frost depth is about...
  12. jyf

    Build a road in the narrow site

    thanks, msucog. I will ask some Geo guy about that. Yep. I think you got a worse case than me. see if I can post a drawing to make myself clear.
  13. jyf

    Build a road in the narrow site

    Thanks Zambo, It's a minor rail. And of cause we can bring the material in, as you said I do need a drain at the base of the embankment, that cause the base of the embankment goes to deeper and deeper, at the end of road, the base will be 4m deeper than the road, can backhole reaches that 4m...
  14. jyf

    Build a road in the narrow site

    Thanks for all! The issue is that concrete wall is for holding the tank farm and it’s about 2m height. The client wants to build a road right against the wall with the same height. My thinking is to build the road, the construction contractor should use a dozer start with the rail side to...
  15. jyf

    Build a road in the narrow site

    Dear all, We have a site is 15m wide (one side is rail way and the other side is concrete wall). I need design a 4m wide road get through that (length will be about 750m). Anybody knows construction contractor can do that or not? Thanks in advance. jyf