  1. jterrell22

    Code Requirements for Air Handling Units

    Smoke detectors are required in the return side by the IMC 606.2.1. I'm not sure, but I think NFPA 90 has some requirements for detectors as well.
  2. jterrell22

    Warehouse bathroom cooling

    I wouldn't worry about the negative pressure too much (it's a good thing in a bathroom). Most bathroom doors utilize a closer, and the resistance from the closer should provide enough force to counter act the pressure. The easiest way to overcome this would be to swing the door out if possible.
  3. jterrell22

    Warehouse bathroom cooling

    Just finished a project like this. We had to cool a restroom area in a large unconditioned warehouse. We went with something similar to your second option above. We used a mini-split to condition the space. We put the bathroom exhaust on a delayed timer to allow the fan to run after the bathroom...
  4. jterrell22

    Understanding HVAC symbols in cad drawings?

    It may be a flexible connection (DS045 in section 4.5 of SMACNA CAD standard)