Hello all,
I am an intern at a municipality and I am having trouble finding a solution to a problem my boss posed to me. The WISDOT is placing a 20 foot fill over our DR-18 S-900 water main pipe that is trenched in 6.5 feet below existing ground. All in all there will be 26.5 feet of cover over...