Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations waross on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Recent content by jcroley

  1. jcroley

    Parallel 4160 volt cable sizing

    I need some help sizing 4160 volt parallel cables. I have a 6000 HP, 734 FLA motor load fed with 105 degree C cable. I want to feed it in an underground duct bank. Article 430.22 says that my conductor has to supply 1.25 times the FLA or 917.5 amps. Divided by two results in about 459 amps...
  2. jcroley

    fused cutout as a service disconnect

    Yes, it is a 15000 kva xfmr. If not fuses, what do you recommend? This is a solution that S&C recommended. Thanks, Jim
  3. jcroley

    fused cutout as a service disconnect

    I have a question on what qualifies as a service disconnect. I have a 25kv service feeding a 15000 KVA transformer. The utility company is providing the primary underground, but the transformer (customer owned) has top bushings and I have to transition up a pole and feed it from overhead. The...
  4. jcroley

    4 wire vs. 3 wire service

    Thanks Reddog. This was my plan - I was pretty positive that was my only option, but I kept hearing from folks that the neutral could be terminated at the transformer. Just didn't sound right. Jim Thanks, Jim
  5. jcroley

    4 wire vs. 3 wire service

    I have a 3 wire vs. a 4 wire question for you folks out there. My primary transformer has a 12470 volt, 3 phase delta primary - 4160Y2402 secondary. However, my loads on the secondary of the transformer are all 3 phase, 3 wire loads (large motors). Can I ground the XO terminal on the...

Part and Inventory Search