Thank you very much for your information, JAE. It is really very helped.
But now one more question comes.
The scenario is like this: the tributary area of one rafter is smaller than 700 s.f., but the tributary area of the multi-buckled rafter is larger than 700 s.f. So one can argue that...
I am not against the new 16 hour SE exam, My point is NCEES could arrange things better for those people who already passed either SE1 or SE2, now that the new 16 hour SE exam is a combination of SE1 and SE2, then why not allowing those people who passed SE1 take only 2 afternoon session (which...
How long has SE1 test lasted? I am afraid a few years later, another new SE test will come into effect(maybe in combination of SE1, SE2, SE3, Survey, with a 3 or 4days test) to replace the coming 2day test in 2011. And another a few years later, another new SE test with 7 or 8 days test will...
Thanks guys for your response. I contacted the contractor and got the whole picture of the story. Yes SSK is an abreviation for a structure (headache for these contractors to use those abreviation). he concerns about the balance problem when lifting the SSK structure.
Hi there.
I can find the definition of load case-1 to load case-4 for wind load method 2 from Figure 6-9 in ASCE7-05, but can not find the definition of load case for wind load method 1. Are we supposed to use the same Figure 6-9 for definition of load case for wind load method 1?
Thanks.