John thanks for reply.
I know your company and I ordered two books from your company website two year ago. Good stuff. Very instructive.
I was looking for experiences and in-service inspection plan to get more grip on scope (%) and location to inspect by learning from others.
Unfortenately my...
Hello Vidaman,
First check if this cartridges are excluded from the scope of the PED. CO2 is considered as an dangerous good.
Probably Art 1 exclusion 3.19 is applicable.
I did an swift check on the ADR. According to special provisions 584 and 653 you might have an escape. So your cartridges...
Thanks MJCronin and metengr for your reply.
Original question:
Dear all,I am looking for an inspection plan for an HRSG including pressure piping. Triple pressure, horizontal design, ASME code and heated by a GT26 gasturbine (50 Hz equivalent for GT24). Located at Lelystad, The Netherlands an...
Dear all,
I am looking for an inspection plan for an HRSG including pressure piping. Triple pressure, horizontal design, ASME code and heated by a GT26 gasturbine (50 Hz equivalent for GT24). Located at Lelystad, The Netherlands an just starting commercial running.
Best regards,
Martin