Recent content by HFP13

  1. HFP13

    NFPA 850 and 20 numbers of jockey pump ?

    I think some of us are not satisfying the question of the originator. What he is asking is if only one jockey pump is enough fo an installation. Electrically driven primary fire pump and Diesel-driven secondary fire pump set-up for large facilities is a usual practice for system reliability...
  2. HFP13

    NFPA 850 and 20 numbers of jockey pump ?

    I think and as NFPA says, one 1 jockey pump will be enough. Remember that this is for pressure maintainance service only and will run for a few minutes only. If your concern is back-up, you still don't need an extara jockey pump because once it fails your fire pump will run. rgds
  3. HFP13

    High Pressure at RO membrane

    Mike, You are saying that over dosing the feedwater w/ NaOH will have a worse effect on water quality. Is this the reason for biofouling? Thanks
  4. HFP13

    High Pressure at RO membrane

    Thanks, Mike! Our raw water is coming from the idustrial zone developer which they claim is already pre-treated. The water analysis varies slightly. By the way, we do chemical injection to remove CO2 prior to entering RO#3 & 4. The question now will be the effect of the degasser w/c is off-line...
  5. HFP13

    High Pressure at RO membrane

    VER, CAn you kindly provide me a computer simulation analysis in order for us to head into the right solution to our problem? -We have 2-pass (RO#1/2 machines in parallel is 1 st pass and RO#3/4 on 2nd pass). -We don't have water softener installed in the raw water. -We have MMFs -We have...