Recent content by hello12345hello

  1. hello12345hello

    Steel Column

    I agree but column is continuous so i can not continue orthogonal beam to pick up the other beam.
  2. hello12345hello

    Steel Column

    if i will consider torsion loading i will add additional moment Mx from connection eccentricity = Beam reaction times distance between column center and connection .. Also additional moment My (torsion moment = beam reaction times 8" which is distance between column center and load.) so there...
  3. hello12345hello

    Bearing Walls

    pics are not clear.
  4. hello12345hello

    shear connection

    i have steel cantilever beam with simply supported beam back up. Column is continuous. i will have moment connection at one end as shown. if i will get upward load at the other end then how to design that connection. To design beam i will consider appropriate unbraced length.
  5. hello12345hello

    Steel Column

    I am trying to design steel column. As shown on attachment beam is 4in away from column. And beam has torsional loading. To check column do i have to include Mx moment and My moment both. what eccentricity i have to include for My moment.
  6. hello12345hello

    Shear Wall Hold Down Distance Apart

    i have 3 story wood shear wall with 12'4" total length and it has 6ft opening in center. So fully sheathed wall segment is 3'-2" and 3'-2" each side of opening. total ht is 30ft. Can i still use perforated shear wall approach.
  7. hello12345hello

    shearwall

    so here try to understand what is tension at lower story than. see attachment. http://files.engineering.com/getfile.aspx?folder=52e691c9-5f1d-4dc6-b136-0baef237e3a2&file=Tension.jpg
  8. hello12345hello

    shearwall

    I have two story wood shear wall. Upper story wall is 12ft wide and lower story is 9ft wide with 3ft opening at the end. To check overturning can i still use 12ft wall with proper uplift connector at lower story. I will use 9ft wall only for shear capacity.
  9. hello12345hello

    Moment Connection

    I am trying to design HSS beam to HSS column moment connection. Is there any resource for that. if i will use weld all around is this consider as moment connection.
  10. hello12345hello

    Screw shear capacity

    I am unable to find information for allowable shear for panel diaphragm to attach plywood with douglas fir-larch with screw instead of nails? IBC has table for nails only.
  11. hello12345hello

    Masonry grout

    I have masonry wall and have vertical rebar at every 32" o.c. so i will grout those cells only where i have vertical rebar. but if i will add horizontal rebar at every 48" o.c. due to shear wall then do i have to use solid grouted wall or i should just add bond beam at 48" o.c. with rebar. so...
  12. hello12345hello

    masonry stress

    I have new W-beam lintel sits on existing unreinforced masonry wall. reaction is 10 kip. What is allowable bearing stress for URM. Wall is 6in thick. Do i have to use same 0.25f'm.
  13. hello12345hello

    suspended unit

    Mechanical unit is 2ft high and that will fit between ceiling and roof framing. So mechanical unit is suspended from steel framing. do i have use steel hanger at four corners to support this unit. what is best way to support.
  14. hello12345hello

    suspended unit

    I have one mechanical unit which is suspended from steel roof framing. how to support unit with steel framing. unit weight is 500 lb. Thank you