i didn't see another crack from below. mean is not AAr reactions. but i get the photo of crack on the above ramp. but the crack is about 4ft away from the spalling concrete.
The hanger had been installed long before. This damage occurred in the HEX room and the damage has just occurred. This building has been around for 10 years. Is caused by a vibration of a heavy vehicle on the ramp.?
what is the best caused should i tell them?
This is a concrete spalling location.
can it be the vibration of a heavy vehicle? From the information I got, there was a food truck event being held around the road, and the ramp was the exit and entry point for the food truck. The weight of the food truck is estimated at 3 tons
hi im from Malaysia and im new in this group. Hope you guys can help me.
My issue is spalling concrete occurred on the ceiling slab (600mm x 600mm x 60mm in depth). the reinforcement bar is not corroded and no sign of water ingression. Above the defective concrete is ramp area and open air ...