I have a situation along a shoreline where an existing 8-inch pipe ends at bulkhead, approximately 3 feet above grade. The grade below is a rip-rapped slope @ roughly 20%. An engineer wants to upsize the pipe to a 12-inch and increase the amount of runoff discharging to the outfall.
Given...