  1. Grader

    Road construction on old landfill

    Keep in mind the value obtained for the money you spend on a project. This is a job that you could dump a pile of cash and not receive the expected result. I can assure you that short of removing the old dumpsite in the area of your roadway, the road will eventually move. I believe pigdog has...
  2. Grader

    embankment fill on slope

    Depending on soil conditions, purpose of fill, structural integrity, etc., the most common maximum fill slope is built at 2:1. Steeper slopes can be engineered with the help of your soils engineer, if required. Many times a combination of geo-grids, retaining walls and earthen fills will be...
  3. Grader

    Dust control on gravel roads

    USC Marine Studies Center at Catalina Island is now using an environmentally friendly, non hazardous product for dust control and road stabilization called T-NAPS. The best non-toxic solution of all is plain water applied with a water truck or delivered through a piped system. Repeated, long...