@Agent666
I have complete control of the design however in terms of construction it will most likely be in-situ as its a settlement relocation project. From what i gather is its that i should replace the interim landing which was a 175mm two-way spanning slab to a beam and design the entire...
I am tasked with the design of this structural system of a reinforced concrete suspended stair. The stair is for public access, the first landing and last landing is a proposed footpath on grade 1.8m wide. The two footpaths are connected via two 3m flights of stair with an interim landing which...