Good morning everyone.
I am analyzing a mat foundation considering 3 loading stages i.e
1- construction of mat foundation
2- Placement of fill over it.
3- Applying superstructure load over the mat.
I am assuming that after each stage only 10% of the stage settlements would be carried over to...