Dear Friends
My project is regarding design of a pump station for a condensate terminal.
condensate is available in one tank.i am going to design a pump(one spare will be considered) which is capable to transfer 1500 m3/h condensate via 300 meter pipe to a carrier(ship).
no diameter for pipe...
my question is regarding the flare system capacity.
suppose in one platform 6 wells exist in production each can produce 100 MMSCFD in normal and 120 MMSCFD
in maximum capacity. flare capacity was mentioned 600 MMSCFD.
I am going to check the flare capacity in block outlet case by evaluating...
actually the problem is with first 500 meters of pipeline located near onshore.so intelligent pigging is required.
managers think if this method is applicable then it will be less expensive and less time consuming rather pigging from offshore.
my question is about pigging operation in gas pipeline,but before anything let me explain the system:
System:
multiphase pipeline (gas+condensate) comes from platform to onshore facilities.distance between platform and onshore plant is around 100 km.a 4" MEG injection line is mounted to...
Dear Friends
My question is regarding transfer of condensate from a gas field platform to onshore.
In all projects that i have seen ever , after separation of gas and condensate and water in free water knock out drum and coalecer the gas and condensate are mixed together and sent to onshore via...