  1. duckhawk

    Welded connection under loads in 3 directions

    Based on "Eccentrically Loaded Weld Groups" in Part 8 of the steel manual, I think you could do SRSS in 3D for all your loads, calc what the angle is between the resultant and weld axis, and then check the weld with equation J2-5 in the steel manual. If moment is to be transferred through that...
  2. duckhawk

    ASCE 7-16 15.4.4 - Approximating Seismic Period

    Turns out I was using wrong units for deflection.. when the right units are used, the Rayleigh method works and matches RISA, as JoshPlumSE stated above. Also, I can confirm that applying 1 lateral load at a time and getting corresponding deflections is incorrect. The correct way is to apply all...
  3. duckhawk

    Crazy cantilevered steel deck

    Nah. I'd prefer the cantilever to come from a long beam connected to the framing of the house, not a couple of 4-bolt baseplate connections.
  4. duckhawk

    ASCE 7-16 15.4.4 - Approximating Seismic Period

    Here is an example problem with the Rayleigh method. In this example, it says all loads are considered in 1 load case, then the deflections at each level are determined. This seems to be the answer. This is opposed to the original method of applying 1 load at a time...
  5. duckhawk

    ASCE 7-16 15.4.4 - Approximating Seismic Period

    This is one of the reasons why I'd like to understand equation 15.4-6 better. Using it, I'm calculating a period of about 0.6 seconds. Using the dynamic analysis in RISA, it is calculating a period of 1.2 seconds.
  6. duckhawk

    Wood post Cracks

    From a serviceability standpoint, the checks in the column don't look too good, even when the strength requirement is met. What about a facade for the columns to hide the checks?
  7. duckhawk

    ASCE 7-16 15.4.4 - Approximating Seismic Period

    Hello, I have a question about section 15.4.4 in ASCE 7-16. I'm trying to use equation 15.4-6 to calculate the approximate period for a trussed tower. However, I don't understand the equation they give fully. It says fi represents any lateral force distribution, and then it says the elastic...