We need to seal off the existing input (under water) into the tower with concrete. New input is above the tower level. It is relatively narrow at the existing input into the tower and we would need to bypass the area. We would need the scaled drawings in order to make a bypass.
I have a surge tower that is currently being used and I want to survey the inside. I have contacted some companies looking to see if sonar imaging can be done that yield to scale images inside of the tower. I am being told that this cannot be done while there is flow in the tower. Does anyone...
Looking for a design consultant. It's for a job overseas and the off the shelf ones are a bit to costly for the owner. Depths are also custom (24" deep). We are having trouble meeting the specified requirements. Have had independent labs run ASTM E477 and AMCA 500 tests on samples and they...