  1. Decartes

    ASCE 7-05 Wind Loads Question

    @ JAE and RobertHale, I agree with both of you, ASCE 7-05 Sect. 6.13 applies, because the roof of the open structure is a critical design feature. Thanks to all who replied so far, I really appreciate it.
  2. Decartes

    ASCE 7-05 Wind Loads Question

    @MiketheEngineer, how would you then account for the uplift/downward pressures on the roof? Do you think ASCE 7-05, 6.5.13 or 6.5.15 would apply?
  3. Decartes

    ASCE 7-05 Wind Loads Question

    Does anyone know, what part of ASCE 7-05 addresses/is applicable to the design wind load on an outdoor structure w/ a Gable Roof supported by one column? You heard me correct "one" column.
  4. Decartes

    CMU's Equivalent Solid Thickness (EST) issue.

    @concrete masonry: My post is a response to the thread: thread507-253979: Masonry Wall Net Area vs. Equivalent Thickness It's not a question, but a reply.
  5. Decartes

    CMU's Equivalent Solid Thickness (EST) issue.

    thread507-253979 EST = Equivalent Solid Thickness and is calculated based on the "Absoulte Volume" of the CMU Block divided by the Face Shell Area (usually equal to 7.625"x15.625"/144 = 0.83 ft^3). This "absolute volume" (founded by testing:see...
  6. Decartes

    Minimum Edge Distance

    Thanks everyone, you input has been very helpful. I'm sticking to the code required min.
  7. Decartes

    Minimum Edge Distance

    Bannu, that's understood. The question is how restrictive should I be about the increment "C2" which should be added to the standard min edge dist?
  8. Decartes

    Minimum Edge Distance

    How stringent should I be on the minimum edge distance recommend by the AISC ASD code (9th ed.) in Spec J3.9. Specifically, should I flag a fabricator if he/she is providing the standard hole size min. edge. dist. for short or long slotted holes? Struct. EIT