    Pad printing application

    Try the following web sites: www.padprinting.net www.tampoprint.com www.padprint1.com www.padprintmachinery.com Regards, Steve,UK
  2. days

    Emmigration to USA

    Hi, I currently work as a Production Engineer in UK, Apprentice trained, HNC qualified, I'm 40 years old with no ties. I have experience in various light assembly environments. Currently I am employed in the Electrical Industry, the company manufacture - Distribution Boards, Consumer Units, Lamp...
  3. days

    Time Study

    I would recommend MOST over time study any time. I have used MOST in UK for the last 5 years. First in Ink Jet printer assembly and now in Electrical Dist Board assy including fabrication of enclosures, copper busbars, semi-auto assy, assy line etc. The technique used is to video the operation...
  4. days

    Pre-calculation of labour cost in a steel furniture factory

    I would suggest that you start by compiling a process route for each component. Then for each operation within the route a standard minute value must be calculated or timed. As I'm sure you need to implement the standards before any oportunity to time every operation, therefore I suggest you use...
  5. days

    Pre-determined Standard Times MOST or MODAPTS. Which is better?

    I'm afraid I don't have experience of Modapts but have been using MOST over the last 5 years in various manufacturing environments, e.g. assembly, sheetmetal fabrication, high volume and low volume, production line and bench work. One area where it really shows it's worth is the feasibillity of...