Can anyone signify the difference between "R+1" and "R+2" in ROHR run summary for pipe stress calculations, with particular reference to pipe support friction coeff's
This is certainly an expansion joint. Dependant on the orientation of the condenser relative to the LP Turbine, in a side condenser arrangement, expansion joints are required on CEP suction. On my current project,maximum design movement of hotwell is +6.1mm x-dirn. A factor of Safety is built...