  1. CTXG

    Treatment process of tailings pond water

    Hi all, This is a very generic question. What are the treatment processes for a tailings pond water to achieve the target effluent quality. What are the considerations? What is the typical process train? Does it include RO? What is the typical recovery and flux of RO, if it does? Sorry have...
  2. CTXG

    Does a change in flow lead to an instantaneous flow downstream?

    Hi all, and thank you to all. Firstly, it is a centrifugal pump with VFD and medium is water. Secondly, I recognise that the VFD takes time to ramp up. However, I would like to ignore this factor. My query is more of due to the length of pipe/inertia/flow, will there be a lag time? Someone...
  3. CTXG

    Does a change in flow lead to an instantaneous flow downstream?

    Hi, I have a pump with VFD, followed by pipelines downstream to point A. For example, the pipeline to point A is around 100m. If I increase the flow by changing the pump setpoint, does downstream pipeline register an increase instantaneously? Or is there a time lag? Thank you in advance.