  1. classyhillbilly

    earth retention, temporary

    pe thanks for the response, sorry for the lack of details...the adjacent homes are approx 10 feet apart ( property lines are approx. 5 -8 feet a part)so it will be almost impossible to get in their property and slope. We already did some demo and i tried to slope or build a bench to stabilize...
  2. classyhillbilly

    earth retention, temporary

    Hello, all, I am an excavation contractor in the seattle wa area and i have a challenging situation. We are demoing a house with nine foot tall walls that once we remove them we will have a hole or void in the building lot, the problem is the earth/dirt is non structural and we cant slope it as...