Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations waross on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Recent content by Checkingit

  1. Checkingit

    Detail view callout.

    Thanks for the reply Brandy7. We are currently using the Standard Y14.3 2003 and referring to the 2.9 Details section it points to Figure 23. That illustrates a Phantom Line Circle with the Detail letter between the arrowheads. I do not have the 1994 release of Y14.3 so I can't verify how that...
  2. Checkingit

    Detail view callout.

    I posted this question in the ASME Forum which was probably not the right place for it, so I will re-post it here, sorry for my newbe ignorance to the layout and sections of these Forums. In the ASME Y14 Standards I have not been able to find any information stating the proper callout for...
  3. Checkingit

    Detail view callout.

    In the ASME Y14 Standards I have not been able to find any information stating the proper callout for DETAIL VIEWS. Such as "SEE DETAIL A". When defining a DETAIL VIEW in Pro-E by default the view callout will include the "SEE" preceding the "DETAIL". I have looked through Y14.3, Y14.4, Y14.24...

Part and Inventory Search