I am currently looking into replacing an older energy management system and was wondering what other facilities might be using.
A few things I am looking for are:
A windows based software program that runs on a standard PC (I don't want to buy a new system each time a PC gives out)
Telephone...
A range hood for a local church's kitchen stove.
The rheostat to the blower motor failed. It is old enough that replacing the rheostat "on off" unit is impractical. They want to simply have a switch to turn it on & off, but when on, on high speed.
The plug to the blower motor has...
What size pipe would be needed to supply a piece of equipment, given the following information:
Utility Gas Source is 40 psig
Equipment - min press 8" WC @ 30 SCFM, max press 75psig, max flow 30 SCFM
Thanks
I am trying to determine the load being added to the electrical system - equipment states 200A Full Load and 25A Largest Motor
When a piece of equipment states "Full Load" Amps, is that the same as "Starting Amps" or "Running Amps"?
Thanks!