I have a poured foundation with a thickened slab that has a 5'x5', 18" cavity for an elevator shaft. Two of the corners support 28kips load each. Each load rests on a 4x4 steel column on the basement slab. Each has a 8"x8" base plate (baseplate corner hanging over the elevator...