D23 , I would like to thank you a lot for your help , because you gave me good information.
I know I bothered you alot , but in case u have any PDF files regarding the calculationS of pumping test or any good information , especifically the mathmatical examples , that can help in assumption and...
EGT01 , Thanks alot
Thats what I need to know , the pumping test should be at full design rate or greater.
Some Engineers answered me that I can depend on the 60m3/hr pumping test if its operated long enough to obtain a stable fluid level, and other said that you might be able to estimate...
The test is operated long enough and they obtained stable fluid level , abouit 48 hours . So u think the data is enough to uggest the 200m3/hr capacity pump ?
All,
I have a new project at which we have to install a vertical turbine line shaft pump for deep water well , the design condition for pump is : 450m head and 200m3/hr capacity . The well is drilled before two months , the contractor who driiled the well performed a pumping test at 60m3/hr...
All,
I have a new project at which we have to install a vertical turbine line shaft pump for deep water well , the design condition for pump is : 450m head and 200m3/hr capacity . The well is drilled before two months , the contractor who driiled the well performed a pumping test at 60m3/hr...
Horizontal booster pumps and vertical submersible pumps are planned to be stored for two years in warehouses , what type of maintenance or what we have to do to protect them during the storage period ?
All ,
In a water project we have some pump control valves, pressure relief valves and butterfly valves,The project was suspended for 1 1/2 year, all valves were bought and stored in warehouse, What type of maintenance do we need to apply to protect the valves during the storage period , is...
My company bought some horizontal booster pumps with two submersible well pumps to be installed in a water project. Due to some reasons the project was suspended for one year , all pumps are already stored in warehouses , Please , I need to know what type of maintenance or how we have to...
My company bought some KSB horizontal booster pumps with two Centrilift submersible well pumps to be installed in a water project. Due to some reasons the project was suspended for one year , all pumps are already stored in warehouses , Please , I need to know what type of maintenance or how we...
All ,
My company has bought some Carrier AC units to be installaed in our project. Unfortunatilly the project is suspended for one year . All AC units were bought and stored at warehouse, During this one year of suspention and storage of equipment do we need to do any type of maintenance for...
I am working in water project at which BA-U Tesnit gasket is approved,this material is asbestos-free. after checking the delivered material I observed that some of the gaskets are Tesnit kemit super, which is asbestos gasket, I am planning to reject them, but I need to know alittle about the...
Hi guys,
does any one of you have datasheet or any information about the vibration limit for KSB horizontal pumps - multitec type C.