I'm designing a new 20 GPM deep groundwater well in an area with shallow bedrock. I'm comfortable with design of the well development (I'm relying on a senior hydrogeologist for that), but the topography and bedrock has presented an interesting challenge for the 1000ft long, 2 inch diameter raw...