Mechanical equipment located at height more than 100 feet shall comply with FMC 301.15,
have a site-specific design (signed and sealed) by a Florida Professional Engineer, indicating
the location of mechanical equipment, the required design pressures and the installation
method.
Page 19...
Document with work to be preformed. Where is the major structural work?https://files.engineering.com/getfile.aspx?folder=ba9bdba7-1742-4c38-a0a8-5cfe7689dc7f&file=389410champlaintowerssouthcareservestudy03202020.pdf
Workers discovered extensive concrete damage and suspended a repair effort last fall at collapsed Florida condo
https://www.msn.com/en-us/news/us/workers-discovered-extensive-concrete-damage-and-suspended-a-repair-effort-last-fall-at-collapsed-florida-condo/ar-AALG7qO?ocid=msedgntp#image=AALF28n|2
Thanks guys nice to hear other peoples ideas. I want him to get a good start when he moves out. His GPA was 3.3 (3.75 for senior year). He is ready to start his Civil Engineering career.