This should be simple...just need some clarification. Thermal relief valve (bellows)on a 4" pipe (150# spec), flammable material. Valve is 1x2, 3 gpm required capacity. Relieves into larger pipeline (not technically a relief header) that is 8" (150# spec). This second pipeline is a feed line...