The design will be based on the City's requirement. Please read the local City's manual first.
The other things to consider for a roadway design is pre/existing conditions. Try to avoid changes. The way the water was entering before leave it in its original form. This is achieved by plotting...
The lab proctor value needs to be achieved in the field with a plus minus moisture. If the lab proctor moisture is 7% make sure that u are using +\-7%. u have indicated 85% but u have not shown at what moisture. The compaction is always a function of moisture. The right time to start...
Based on existing grades, the proposed grades will follow the existing grade. The first step is to create the spot elevations. When all spot elevations work well either using land development or manually interpolate for even spots. Join all even spots will create contours
Start from the driveways with minimum and maximum slopes. 24' Firelanes will surround the building. There should be two Drives. The firelane slope should be away from the building. The building sidewalk will not exeed 2% x-slopes. The Architect should provide the layout with parkings. The...