There is a pervision on IBC section 1912 that over-writes the ACI chapter D limitations. End result is, you apply a 0.75 - factor to your factored nominal capacity of the anchor rod.
I just finished my masters, and to tell you the truth it is a lot of pain. Good luck with it.
Some of the classes that i would suggests in addition to "definetely take category" are:
Advanced Structural Analysis
Structural Dynamics
Into to Finite Element Analysis
Prestresed concrete
Advanced...
Just to give some background info: the company I work for is a very big consulting company, I have been working for three years and my performance reviews were very good. My dilemma is that I just received my MS in Civil Eng and I was thinking of asking my boss for a raise.
Based on all of your...
J1D, all of your comments are valid, but the casing width is set, and batter piles are not a feasible option becouse the axial loads are very high, and geotechnical capacity of micropiles would be not good enough. I also considered the grout to take some commpression but it is only 10% of total...
Thank you for your response JiD,
The reason why it was considered a fixed head connection was that more latteral capacity can be achieved from the micropiles. Micropiles are emeded 20" in pile cap and i have checked that there is enough embedement to transfer the moment. What i am having...
Hi everyone,
I am designing a foundation consisting of micropiles (10" OD steel casing, filled w/ grout). Since my design assumes a fixed-head, i have to design the micropile for max fixed head moment. I am having difficulty to find what is the allowable bending stress specifically for...
Hi everyone,
I am designing a foundation consisting of micropiles (10" OD steel casing, filled w/ grout). Since my design assumes a fixed-head, i have to design the micropile for max fixed head moment. I am having difficulty to find what is the allowable bending stress specifically for...