In a reinforced concrete buildings project, the contractor casted about 150 foundations with 6 ?14mm starter bars for the columns, at a later stage it was found that the reinforcement in some columns has to increased to 6 ?16mm, the first proposition was to add dowels by drilling and epoxy, then...