Hi everybody,
have anybody any experience on combustion flue gas flow measurement in large stacks?
Large means 40m. with 5m. diameters + 50m. with 4m. diameter. Total 90 m.
Flow is about 100.000 SCFM at 700°F.
I'm oriented on S-type pitot tube as claimed by the EPA code (mot mandatory in my...
Hello,
I have to purchase multicore cables for installation in oil refinery site. Cables will be used for trasmission of 4-20 mA only signals in intrinsec safety style. Cable lenght will be 500mt and cables will run in parallel row on rack. Segregated by signal type and far enough from any high...
Large shear load on existing column base results in large shear forces on anchor bolts. Bolts ok, however any estimate on the length of bolt bearing on concrete (Please supply reference) would be appreciated.