BigH has the best idea. I've paved (2 1/2" section) on 3 feet of 57's and had a hell of a time. Had a dozer pulling the paver through the stone because he was bogging, had a loade witha side dump bucket load the paver bowl from the side so as not to ruin the grade in front of the paver. After...