Thanks for replys guys forgot to mention I would be checking columns after they had been shimmed and aligned onto grid by erectors and would be using total station to line in afterwards so i was wondering og the best way to plumb them up ie do i sight the top then measure the difference at the...
I am a setting out engineer and am being pushed more towards construction aspect of engineering at work(used to be civils) and was looking for advice on the best/easiest way to plumb up steel columns prior to grouting.I Am ok with aligning them onto grid.
Being pushed more towards construction aspect of engineering at work(used to be civils) and was looking for advice on the best/easiest way to plumb up steel columns prior to grouting.I Am ok with aligning them onto grid.
looking for advice on best or most accurate accurate way of transferring existing control points onto upper levels of buildings as construction proceeds .