Drainage Structure to Withstand 40 KIP point load
Drainage Structure to Withstand 40 KIP point load
(OP)
How can I determine if a precast ring, dome and other structures (slabs, castings) are designed to withstand a 40 KIP point load from an aircraft? Any references?
Thanks for your help!
AC
Thanks for your help!
AC




