INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Pipework Mains in a Curved Corridor

Pipework Mains in a Curved Corridor

Pipework Mains in a Curved Corridor

(OP)
I have an unusual problem, though I think it is not unique.

I am currently designing the Heating, H&CWS to a school. Unfortunately, the planners insist on an unusual shape and the Architect has obliged by creating a building in the shape of a long sweeping 'S'. The corridor is about 2m wide (which is where I will be running my mains).

Now heres the problem.

a. Expansion. I will get some weird expansion problems since I can't guide the pipe or anchor it in any prticular place.
b. I have offtakes or side connections passing from the mains into classrooms. The pipework movement (Which is not predictable)will create stress on the branches.
c. I wanted originally to use fully welded steel for the mains and branches to minimise risk of leaks and solder ring copper joints for the hot and cold water services.

I have looked at plastic pipework...and there are lots of systems available. Push fit, crimp fit, pressfit, steel ring gripping 'o'ring sealed this and that...but has anybody had any experience with plastic pipework that is competitively priced (Plastic manufacturers seem to take the mick with their pricing even though the materials must be much lower than steel or copper....boy that bugs me)

I have used Uponor Unipipe in straight runs and GF Instaflex but I'm am not sure of the suitability. Will I get problems with supporting, bracketting, expansion, movement hardening etc??

Has anybody got any recommendations. My first opinion is to stick with traditional methods and make all mains welded or soldered.

answers on a postcard

Friar Tuck of Sherwood

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources