INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

excavating under existing comm.building

excavating under existing comm.building

excavating under existing comm.building

(OP)
An existing tenanted rc frame building is in dire need of on site parking. Does anyone know of possible techniques to undermine the building for three levels of parking. The concrete columns are at approx. 7m spacings and the plan area is about 3000 m^2. Cape Town SA.

RE: excavating under existing comm.building

AISC has a lot of information on parking garage design and evaluation.  Even some information is for free if you not a memeber and if you are, even more information is there.  I remember seeing it and thinking why so much documentation on parking garages.

Hope this helps, Alex

RE: excavating under existing comm.building

You have a serious underpinning / support of excavation project.  I suggest you call one or more leading underpinning contractors and one or more major geotechnical consultants, all of whom have experience with similar projects.  I can't help you with names of companies in Cape Town, SA.  Sorry.

The bigger problem may not be supporting the existing footings as much as supporting the lowest existing floor slab which is probably a thin slab on grade.  A similar project, I think, is being constructed at the United States Capitol Building in Washington, DC.

RE: excavating under existing comm.building

PEInc is right - you need to discuss this with several qualified local geotechnical consultants as well as underpinning contractors.  And the ground floor will likely be an issue.

Hire the best - not the cheapest.  You will save money - and heartache - in the long run.



Please see FAQ731-376 for great suggestions on how to make the best use of Eng-Tips Fora.  See FAQ158-922 for recommendations regarding the question, "How Do You Evaluate Fill Settlement Beneath Structures?"

RE: excavating under existing comm.building

moxl, answer is "a bit" late but you can check the site www.yurkevich.ru a firm deals with top-down construction.  

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources