ePac CMMS
ePac CMMS
(OP)
Anyone,
I have recently inherited the task to engage a CMMS; Epac. Does anyone have any insight as to the pitfalls or stumbling blocks associated with this system?
It will have to be blanket a 17 location system coast to coast
I have recently inherited the task to engage a CMMS; Epac. Does anyone have any insight as to the pitfalls or stumbling blocks associated with this system?
It will have to be blanket a 17 location system coast to coast




