INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Fill on top of leaching feild

Fill on top of leaching feild

Fill on top of leaching feild

(OP)
Before buying the house, I had the former owner replace the stone leaching feild for the septic. It was dug out and new clean stone was put in, however, the old stone was left on top and poorly graded.  Basically can't mow it.  Besides raking out the surface stone and regrading, can I put fill (topsoil) on top and all around the system? If so, what's the recommended max. depth of fill so I don't harm the underneath? Also, there were vent pipes installed on the four corners, can I cut them down low and plant bushes to hide them?  Thank you for your input.

RE: Fill on top of leaching feild

You should contact the local authority/agency having jurisdition, they should be hepful and have handouts with typical design information.  Could also contact a local engineer practicing septic system design, they could probably direct you.  In my experience the stone only needs to extend a few inches above the drain pipe, probably no more than 6 inches.  Top of drain pipe shoule be at least 18 inches deep, deeper in colder climates.  Above the stone should be a geotextile (filter fabric) to prevent finer soils from getting into the stone.  Above that you can place nearly any type of soil including topsoil.  Also not a good idea to have stone to the surface as then runoff can esaily penetrate the drainfield.  Local codes will also tell you that standpipes and cleanots should extend above the ground, probably one foot minimum.  You could stick a tape measure down a standpipe and may find how deep your drainfield pipe is.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources