INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Drilled Pier installation near a MSE wall

Drilled Pier installation near a MSE wall

Drilled Pier installation near a MSE wall

(OP)
Drilled piers will be installed near a new MSE wall. I know how to analyze the additional horizantal stress on the wall caused by the weight of the installation equipment. But how to analyze the influence (installation process, vibration) of the piers on the wall? What's the typical spacing required between the pier and the wall?

RE: Drilled Pier installation near a MSE wall

Can you give a better description of what you are doing?  I surmise you are going to install drilled piers just behind the MSE wall - outside the zone of reinforcement or will you be installing within the zone of reinforcement - else why do you have horizontal forces on the "wall" - the weight of equipment will probably be small to the weight of the soil if you are in the "retained" area.  Or are you going to install the drilled piers at the base of the wall - outside the wall?  How large will the drilled piers be?

RE: Drilled Pier installation near a MSE wall

(OP)
After discussing with the structural engineer, I finally figured out what he needs.  Basically, they want to build a MSE wall first, then install drilled piers near the toe of the MSE. The center line of drilled piers is 4.5 feet away from the face of the MSE wall. The diameter of the drilled piers is 36 inches.

RE: Drilled Pier installation near a MSE wall

evenbetter,

The 4.5 ft away from the toe of the MSE wall should not be a problem, but you will need to assess soil conditions to ensure there will be no problems during drilling or during the pouring of the concrete.  A fast set concrete may be required depending on site conditions, such as the height of the MSE wall and the potential for a local slide or soil creep into the bore hole.

regards

RE: Drilled Pier installation near a MSE wall

As intimated by cdh61 - you would have to consider sloughing into your drilled pier.  If you have firm to stiff clays, this wouldn't be a problem.  Even in softer clays, you would not likely encounter a problem because of the flexible nature of the MSE walls - still, you should be careful and determine the various factors - then use your judgment.

RE: Drilled Pier installation near a MSE wall

Sorry for this second post - but I was thinking as to why you want to build the wall first, then the piers.  The wall will introduce restrictions on your pier installations.  If you are thinking of reducing negative skin friction (dragdown forces), then you could cover this in design of the piers.  In a practical sense, you might find the resrictions to installation - while not great - still a headache.

RE: Drilled Pier installation near a MSE wall

(OP)
Thanks for the reply. I am not sure why the design team want to build the wall first.

In the reality, geotechnical is not included in the design team 90% of the time. Just my 2 cents.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources