INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Rockfill Dam and Anchors

Rockfill Dam and Anchors

Rockfill Dam and Anchors

(OP)
Our company is a major electricity supplier located in Australia. One of our dams is a 93 m high Concrete Face Rockfill Dam. The slope of the downstream face of the dam is 1V : 1.3 H (38 degrees). The dam was constructed during the early 1980's and now the spillway has been deemed to have insufficient discharge capacity.

One of the options to increase the capacity of the spillway is to cover the face with Roller Compacted Concrete (RCC) constructed in steps and allow water to spill over this. The RCC will need to be anchored to the rockfill. When the this secondary spillway is in use the estimated uplift forces will be in the order of 10 - 15 tonnes per square metre of spillway area.

The problem we have is how to drill a hole on face of the dam, how to install the anchor (about 3 m in length) and how to grout the anchor into the rock (the rock fill has no shear strength). Does anybody have any suggestions from past experience about installing anchors / dowels in rock fill   

RE: Rockfill Dam and Anchors

How would you classify the rock fill?
Two methods to consider
1) mass stabilization of the upper 3 m of rock fill with grout.
2) Construct anchored/grouted columns with mass sufficent to resist uplift.
Both methods will require special drilling techniques and the ability to control the lateral and vertical migration grout.  The selection of grout, such as viscosity modified, low slump or quick set will depend on the nature of the rock fill.

RE: Rockfill Dam and Anchors

I would be concerned about covering the downstream face of the dam with concrete.  Currently any water leaking into the dam can just flow out through the rock fill.  Covering the downstream face could effect this drainage.  Any changes to the drainage through the dam should be very carefully considered.

RE: Rockfill Dam and Anchors

Wollundry5
Assuming the filters and drains are not affected by the downstream face you can drill through the RCC and rockfill to the foundation. Anchoring post tensioned tendons into the foundation will provide sufficient downforce.

However, the dowstream face is very steep and it may be more economical to provide additional RCC to flatten the slope and provide the additional weight required.

RE: Rockfill Dam and Anchors

wollundry5,

I am not very comfortable with the idea of drilling into disintegrated mass of rockfill and grouting an anchor. The intake of grout may be so huge so as to make it economically prohibitive. The grout will just not stop at upper 3m or in the vicinity of the hole. You may end up grouting the whole damn.

One way may be to thicken your RCC layer so much so as to be stable under its own weight. I understand that you will get very high dimensions, I guess more than 6m deep, but this is the very purpose of RCC technology -- cheap concrete for massive jobs.

RE: Rockfill Dam and Anchors

I agree
RCC is not reinforced.  I always design it to be stable under its own weight.  The assumption that once cracks form, you will have a series of stacked blocks.  This will necessarily complicate your anchoring computations and makes it difficult to analyze.  For instance, how will you know that a crack doesn't form at the anchor?

RE: Rockfill Dam and Anchors

In my recent involvement with RCC, the RCC was overlayed with reinforced concrete.  Therefore, the formation of 'stack blocks' could be eliminated once the anchorage is placed above the reinforced concrete.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources