INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Demonstrating ROI of FEA
2

Demonstrating ROI of FEA

Demonstrating ROI of FEA

(OP)
I lead a CAE group which supports a large engineering
organization.  Managers in the organization often suggest
that I develop a means for demonstrating the ROI, or the
cost and time savings, for FEA or other engineering
analysis projects that my group completes.  When I ask
customers about the cost and time savings, they often
reply that they are unable to make such an estimate.

I imagine that many of you working in FEA have encountered
questions about the value of your work.  How do you
quantify the cost and time savings?  Are there any
existing standard methods for doing so?  Any suggestions
and/or references would be greatly appreciated.


Thanks,

EMS

RE: Demonstrating ROI of FEA

Why not bounce the question back to them and ask how they justified investing in FEA if they didn't know the costs involved? Then pick up and modify the financial model used to justify the original decision. Sounds like they are trying to get you to do their job.

In our case FEA has the following benefits:

well integrated with CAD
reduced numbers of prototypes
reduced testing of prototypes
some forms of analysis are practical with FEA that were impossible beforehand, ie a step function change in capability


and disadvantages

needs a lot of component level testing
more complex testing of prototypes for correlation
replaced experienced engineers and designers with wet behind the ears analysts
 

Cheers

Greg Locock

RE: Demonstrating ROI of FEA

Finite Element analysis is a little like acronyms. At first sight their use seems to be time saving and hence of cost benefit but can in fact lead to more time being wasted trying to figure out what they actually mean.

The cost benefit of using finite elements can depend on what you use it for. If it's for assessing 'what-if' type scenarios then the benefit can be enormous in saving the cost of building prototypes and trying to measure your results. If you use it for failure assessment then, again, it is of obvious benefit in raising your understanding of the failure mechanism and using that knowledge for either future designs or the best method of repair. If it's to assess a design so that you get a nice colour picture to impress your boss, then it's probably a waste of money.

Having the ability to use modelling techniques in a company is of benefit in giving your customer greater confidence in your design and hence the potential for more orders.

Evaluating each of the cost benefits mentioned is practically impossible though. Employ an accountant to work it out, preferably one that has a good imagination and one that doesn't use acronyms.

corus

RE: Demonstrating ROI of FEA

2
I was asked a similar question a long time ago and here is how I did it while being the supervisor of the analysis dept.

1. assigned one engineer to do the analysis and then recorded the number of hours from begining to end + also calculated the actual cost for the software & hardware to get the analysis done.

2. visited with the design project manager and he gave me how much would it cost to design and prototype the same part.

3. visited with the test dept and they gave me how many test engineers and how long would it take to do the test

I then had the cost of doing analysis versus doing test for the same components.

I followed same procedure for two analysis projects. I then took the average and use that figure to estimate the average cost avoidance per day per analyst. I then used this figure to  justify hardware, software, and manpower.

Never again has the value of FEA has been questioned in our division.

good luck.

RE: Demonstrating ROI of FEA

EMS,

There is some information on how to calculate and use ROI in the article Guidelines for FEA shoppers from Machine Design Magazine.

Best regards,

Matthew Ian Loew
"Luck is the residue of design."
Branch Rickey


Please see FAQ731-376 for tips on how to make the best use of Eng-Tips Fora.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources