INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Allen Bradley PLC RS MicroLogix1000

Allen Bradley PLC RS MicroLogix1000

Allen Bradley PLC RS MicroLogix1000

(OP)
I'm fairly new to PLC programming. I'm keen to learn more about Allen Bradley's RS Logix program. I've got the software on my laptop, and i've built the hardware, but having difficulty writing a program! Basically i wanted to write a program for work that would "control a kettle". You basically set the current time and boil time with BCD switches,then power shall only go to the kettle when both times match. The hardware i've built (if you can imagine it!) is as follows:
The controller itself shall be mains powered, and will sit between the mains and the kettle. There shall be a PLC controlling the inputs and outputs of the device, a socket for the kettle to plug into, three push buttons (allowing you to set the present time, the desired boil time, and to reset times if needed), an LED above each push button, showing you exactly what stage you’re at in setting up the device (i.e. if you get distracted after setting the current time, then a green LED will be lit above the push button to show you’ve completed that stage), a tri-colour LED shall be mounted above BCD switches, showing you the state of the controller (amber – clock not set, green – clock set and running, and red – error with entered present/boil time). I also wanted to include a subtraction module into the program, so that if you set the clock to boil for 0700 the next morning, then the power actually goes to the kettle at 0655, so the kettle actually BOILS at 0700 (not sure if this is possible?).

Any ideas?!

Thanks in advance J

RE: Allen Bradley PLC RS MicroLogix1000

JayPLC
You have a good start with your written description of how your process will work. Next you have to identify all the electrical devices which will provide you with inputs (example limit switches, level sensors, push buttons).Next identify all the motors, solenoid valves, indicator lights you will have. This is called I/O (inputs/outputs). Your PLC program will take the inputs massage them with control logic and issue output signals. This is a rathar simplistic overview but it is a start. Good Luck!

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources