INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Sri Lanka, Soil Improvement on Swamp Reclamation

Sri Lanka, Soil Improvement on Swamp Reclamation

Sri Lanka, Soil Improvement on Swamp Reclamation

(OP)
Hi,

I'm working in Soil Improvement Proposal in Sri Lanka.
The land was reclamated on 4m thick peat (N value about 3) and swamp, using beach sand 2m thick (N value about 7). Below peat stratum there exists 6 m thick silty clay (N value about 8 to 16). Weathered rock is 16m below ground level.

Is there any body to tell me about local practice and/or availability of equipement for soil improvement in Sri Lanka.

I'm now considering Paper Drain.

Any comments on Sri Lanka would be very much helpful to me.

RE: Sri Lanka, Soil Improvement on Swamp Reclamation

Consider piles to the load bearing rock.  I once participated in the evaluation of various foundations for a small refinery in Sri Lanka.   Good luck.

chesney@uei-houston.com

RE: Sri Lanka, Soil Improvement on Swamp Reclamation

Unless the proposed structure can take large settlements for over a long period (and I mean long) you should not consider vertical drains for the peat.

Piles may be a good solution but don't forget nsf.  Also, removal and replacement will work for some structures, you might consider bog blasting.

Regards.

RE: Sri Lanka, Soil Improvement on Swamp Reclamation

Hi,
Just to add in; peats can NEVER EVER be stabilised/consolidated if thats what you are trying to do.
Please look up any ground imporvement text book on the subject
Regards

RE: Sri Lanka, Soil Improvement on Swamp Reclamation

I worked on a project very similiar to yours, though I'm not sure you'd have the same equipment, and there was no peat.  It was a retail outlet with parking lot and gas station built on previously unused swamp-land.  The soil profile was approximately 6' of compacted fill (above 90%) over 50' of very soft clay (liquid, at some depths).  Stabilization consisted of reinforced augercast piles to competent soil and a structural foundation to accomodate pile locations.  Again, we had virtually no peat, and still the parking lot was projected to settle on the order of feet in the first two years.  Settling was to be compensated for by repeated overlays during the life of the building.  A very nice structure as it turned out, though I can't say much about the asphalt...

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources