INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Dew Point Calculations

Dew Point Calculations

Dew Point Calculations

(OP)
What would be dew point for air as well as Natural gas, each having Water content:  14 lb/MMscf @85 deg F & 110 psig?

How it is calculated?

RE: Dew Point Calculations

(OP)
What should be the maximum height of LSHH (reference to base of drum) of a Flare Knock Out Drum? Say the drum dimensions are 60" x 20'. The 8" inlet is from the dish-end and the centerline of inlet is 12" from the top. I need the basis or general guidelines to set the height of LSHH (at which the plant will trip) so that it can be applied for other dia vessels (FKODs) as well.

RE: Dew Point Calculations

asgar,

I recommend starting the last question in a new thread with a title associated with the question.

rmw

RE: Dew Point Calculations

Asgar

Look at API 510. Section 5.4.2 deal with sizing a flare KO drum.

Best regards

Morten

RE: Dew Point Calculations

Looking for a little info on scrubbing techniques to help with the BAT (best available techniques)section of a PPC application.  What I would like to know is:

Possible methods of scrubbing a low volume, low conc (20-250ppm)VOC(isopropyl alcohol) stream, and their advantages/disadvantages.  Already searched for possible ways to scrub VOC's but could find no design info, basically want to demonstrate that it is not economically feasible to scrub these emissions.

Ways of scrubbing acid vapours (HF, HCl, HNO3 mix)and alkaline vapours(ammonia, caustic) other than using packed columns.  Especially any info on dry scrubbing techniques.  Again, want to justify the use of wetted packed columns to perform the scrubbing operation as opposed to other techniques.

Any information is much appreciated.

Cheers
Shaun.

RE: Dew Point Calculations

To shaunmiller, kindly follow rmw above instructions to asgar in regard to opening a new thread.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources