Vertical Break
Vertical Break
(OP)
Has anyone come up with a solution on how to insert a 'vertical break' in a view that has a cable coming out of a part at an angle? When I insert, the cable gets "broken" and the two sections are not in-line. I usually have to create two views, crop them, then align them. I have SW04 SP3.0.
Thanks
Thanks






RE: Vertical Break
thanks anyway.
RE: Vertical Break
But, whatever works best for you
RE: Vertical Break
thanks