Silt control within river
Silt control within river
(OP)
Assigned to a bridge construction project with pile driving within the river. Must contain silt during pile driving operations or be shutdown due to fish breeding season. Any suggestions. Average depth is 6-8 feet in most locations, but very fast moving.





RE: Silt control within river
Check out this thread in the Geotechnical Engineers / Earth retention engineering forum. The recommended a sort of water filled geotextile tube / cofferdam which could be placed around your pile driver to help contain the silt.