INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Spillway Flip Bucket Construction

Spillway Flip Bucket Construction

Spillway Flip Bucket Construction

(OP)
We are constructing a dam spillway with a flip bucket energy dissipator.

The bucket radius is 5m and the mass is approx 70 T /m

What is the best current practice to form and place such structures?
The possibilities being considered are:
Vacuum dewatering with a geotextile on the top form to prevent blowholes.
 
Precast of the top 300mm curved profile. This can be cast inverted and fixed to the required line and level in about 5m lenghts.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources